Construction starts as soon as mid-June 2018
We’ve hired a contractor for our project on 35th Ave NE and are gearing up for construction to begin as early as mid-June. Read on for more about what to expect while we build the improvements, which include paving and street design changes to enhance safety and provide more transportation options. Look for more detailed information from us in the coming weeks.
We've divided the project area into 3 work zones. Zone A is from northeast 45th street to northeast 55th street. Zone B is from northeast 55th street to northeast 65th street. Zone C is from northeast 65th street to northeast 89th street.
Work zones
We've divided the project area into 3 work zones. Crews may work in multiple zones at once, but these work areas will help you know what, when, and where major work is happening.
  • Zone A: NE 45th St to NE 55th St (including coordination with 25th Ave NE Paving Project)
  • Zone B: NE 55th St to NE 65th St (no paving work, only street restriping)
  • Zone C: NE 65th St to NE 89th St 
 
We know construction can be disruptive and we'll work to minimize impacts and get the work done efficiently. We'll maintain pedestrian access to homes and businesses at all times. Please continue to eat, shop, and visit 35th throughout construction!

What to expect during construction

See below for a snapshot of what to expect during construction or view our construction factsheet for more detail. We'll share more information in the coming weeks.
  • Construction impacts that are typical of this kind of paving work include, but are not limited to: on-street parking restrictions, periodic traffic detours to nearby arterials, lane shifts around work zones, partial street closures, and pedestrian and bicycle detours around work zones.
  • Work hours will typically be weekdays during the day, but some nighttime and weekend construction work may be needed to minimize impacts.
  • You can expect to hear normal construction noises, like engines and other equipment, as well as louder noises, like pavement cutting.
  • Short-term driveway restrictions, typically about an hour, will be needed when we remove the existing asphalt and when we pave new asphalt. We’ll notify you in advance.
  • Regular updates via email and flyers distributed in advance of work near affected properties. Our outreach team will work with you to address any issues that may arise during construction.

Stay informed

Please forward this email to those you think will be interested and encourage your neighbors, customers, or tenants to sign up on our webpage to receive construction updates by email. You can find more background about this project on our webpage, including how the new street design will better organize the street to improve safety for everyone.

We’re coordinating with other projects in your neighborhood to minimize impacts. See the links below to learn more about these projects.
  • 25th Ave NE Paving Project 
  • NE 65th St Vision Zero Project 
Contact
35th Ave NE Project Outreach Team
(206) 512-3950
35thAvePaving@seattle.gov
www.seattle.gov/transportation/35thNEpaving.htm

 
For translation services, please call (206) 512-3950.
Servicios de traducción e interpretación disponibles bajo petición (206)
512-3950.
Matutulungan ka naming maintindihan kung hihingi kang tulong (206)
512-3950.
요청하시면 번역이나 통역을 제공해드립니다 (206)
512-3950.
Dịch và thông dịch viên sẵn sàng nếu có sự yêu cầu (206)
512-3950.
Haddii aad dooneyso turjubeen fadlen wac (206)
512-3950.
Tajaajiliwwan hiikkaa fi turjumaanaa yoo karaa (206)
512-3950 tiin gaafattan jira. 
በ (206)
512-3950 ጥያቄ በማቅረብ የትርጉም እና አስተርጓሚ አገልግሎቶች ይቀርባሉ፡፡
ብዝቐርብ ሕቶ መሰረት ግልጋሎት ትርጉም ኣሎ እዩ (206)
512-3950::
Copyright © 2018 | Seattle Department of Transportation | All rights reserved.


 






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Seattle Department of Transportation · PO Box 34996, · Seattle, Wa 98124 · USA

Email Marketing Powered by Mailchimp